{"id":390,"date":"2022-10-01T17:29:27","date_gmt":"2022-10-01T17:29:27","guid":{"rendered":"https:\/\/albader2.art4muslim.net\/?page_id=390"},"modified":"2025-07-14T10:31:32","modified_gmt":"2025-07-14T10:31:32","slug":"petroleum-pipelines-department","status":"publish","type":"page","link":"https:\/\/albader.com.sa\/en\/petroleum-pipelines-department\/","title":{"rendered":"Petroleum pipelines department"},"content":{"rendered":"<p><\/p>\n<h2 style=\"text-align: center;\"><span style=\"color: #00457c;\"><strong>Petroleum Pipe Department<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<div  class=\"lgc-column lgc-grid-parent lgc-grid-50 lgc-tablet-grid-50 lgc-mobile-grid-100 lgc-equal-heights \"><div  class=\"inside-grid-column\">\n<p><span style=\"font-size: 18pt; color: #a5212b;\"><strong>This section includes the following works:<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">1 &#8211;<\/span>&nbsp; Installing pipelines to repair oil lines.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">2 &#8211;<\/span>&nbsp; Connecting the water pumping lines to the main lines.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">3 &#8211;&nbsp; &nbsp;<\/span> Removing sand from petroleum lines.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">4 &#8211;&nbsp; &nbsp;<\/span> Mechanical works in gas-oil separation plants.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">5 &#8211;<\/span>&nbsp; Paving and grading roads for oil or water pipelines.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">6 &#8211;<\/span>&nbsp; Leveling and network protection works for oil wells.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">7 &#8211;<\/span>&nbsp; Maintenance of water lines.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">8 &#8211;<\/span>&nbsp; Upgrading the oil eyes, constructing new oil lines and connecting them to the oil factories.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">9 &#8211;<\/span>&nbsp; Construction of water injection lines directed towards the oil plant.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">10 &#8211;&nbsp; &nbsp;<\/span> Connecting wells to oil plants.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">11 &#8211;<\/span>&nbsp; Development of reverse osmosis plants at gas plants.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">12 &#8211;<\/span>&nbsp; Connecting the eyes of water injection to the oil factories.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><span style=\"color: #00457c;\">13 &#8211;<\/span>&nbsp; Updating the drainage systems of the oil works areas.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><\/p><\/div><\/div>\n<div  class=\"lgc-column lgc-grid-parent lgc-grid-50 lgc-tablet-grid-50 lgc-mobile-grid-100 lgc-equal-heights \"><div  class=\"inside-grid-column\">\n<p><img decoding=\"async\" class=\"alignnone wp-image-419\" src=\"https:\/\/albader2.art4muslim.net\/wp-content\/uploads\/2022\/10\/Group-8826-288x300.png\" alt=\"\" width=\" 384\" height=\"400\" srcset=\"https:\/\/albader.com.sa\/wp-content\/uploads\/2022\/10\/Group-8826-288x300.png 288w, https:\/\/albader.com.sa\/wp-content\/uploads\/2022\/10\/Group-8826.png 499w\" sizes=\"(max-width: 288px) 100vw, 288px\" \/><\/p>\n<p><\/p><\/div><\/div>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 18pt; color: #a5212b;\"><strong>The company&#8217;s most important achievements in the field of petroleum pipelines are as follows:<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<table style=\"height: 692px; width: 100%; border-collapse: collapse;\">\n<tbody>\n<tr style=\"height: 24px;\">\n<td style=\"width: 9.34283%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>Project No.<\/strong><\/span><\/td>\n<td style=\"width: 15.8111%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>Project owner name<\/strong> <\/span><\/td>\n<td style=\"width: 14.8871%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>Project name<\/strong><\/span><\/td>\n<td style=\"width: 11.191%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>Project location<\/strong><\/span><\/td>\n<td style=\"width: 14.0656%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>date of contract signing<\/strong> <\/span><\/td>\n<td style=\"width: 34.4969%; text-align: center; height: 24px;\"><span style=\"color: #00457c; font-size: 14pt;\"><strong>Business description<\/strong><\/span><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 9.34283%; height: 120px; text-align: center;\">1<span style=\"font-size: 14pt;\">80<\/span><\/td>\n<td style=\"width: 15.8111%; height: 120px; text-align: center;\">\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Arabian Oil Company<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Saudi Arabia<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #00457c; font-size: 14pt;\">&#8220;Saudi Aramco&#8221;<\/span><\/p>\n<\/td>\n<td style=\"width: 14.8871%; height: 120px; text-align: center;\">Connecting 29 water injection wells to Oil Plant No. 3 in Haradh<\/td>\n<td style=\"width: 11.191%; text-align: center;\">pit<\/td>\n<td style=\"width: 14.0656%; height: 120px; text-align: center;\">2005-04-03<\/td>\n<td style=\"width: 34.4969%; text-align: center;\">\n<p style=\"text-align: left;\">&#8211; Construction and extension of pipelines for 29 water wells and linking them to Water Injection Plant No. 3 in Haradh, with a total length of 31 km and a diameter of 10 inches.<\/p>\n<p style=\"text-align: left;\">&#8211; Provide all necessary labor, equipment and materials to finish the work according to the requirements of Saudi Aramco, and put wells in use for water injection.<\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 9.34283%; height: 24px; text-align: center;\"><span style=\"font-size: 14pt;\">182<\/span><\/td>\n<td style=\"width: 15.8111%; height: 24px; text-align: center;\">\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Arabian Oil Company<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Saudi Arabia<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #00457c; font-size: 14pt;\">&#8220;Saudi Aramco&#8221;<\/span><\/p>\n<\/td>\n<td style=\"width: 14.8871%; height: 24px; text-align: center;\">\n<p style=\"text-align: center;\">Uthmaniye Wells Connecting No. 1588, 1585, 1587, 1589, 1586, 1596<\/p>\n<p style=\"text-align: center;\">In the oil refinery No. 10 in Othmaniye and linking well 1573 to the oil plant No. 11 in Othmaniye<\/p>\n<\/td>\n<td style=\"width: 11.191%; text-align: center;\">Ottoman<\/td>\n<td style=\"width: 14.0656%; height: 24px; text-align: center;\">2005-09-05<\/td>\n<td style=\"width: 34.4969%; height: 24px; text-align: center;\">\n<p style=\"text-align: left;\">&#8211; Construction and extension of pipelines for 7 crude oil production wells, and linking them to the oil-gas separation plant No. 10 and 11 in the Othmania area.<\/p>\n<p style=\"text-align: left;\">&#8211; Work the main lines to transport the oil from these wells to the sorting plant with a total length of 22 km and different diameters ranging from 8, 10, 16 inches.<\/p>\n<p style=\"text-align: left;\">&#8211; Providing all the necessary labor, equipment and materials to finish the work according to the requirements of Saudi Aramco, and putting the wells into use for oil production<\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 9.34283%; height: 24px; text-align: left;\">193<\/td>\n<td style=\"width: 15.8111%; height: 24px; text-align: left;\">\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Arabian Oil Company<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Saudi Arabia<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #00457c; font-size: 14pt;\">&#8220;Saudi Aramco&#8221;<\/span><\/p>\n<\/td>\n<td style=\"width: 14.8871%; height: 24px; text-align: left;\">\n<p style=\"text-align: center;\">Connecting the notables of al-Zayt to the Al-Hotah area, lane 57 and 25, Hawtah 83<\/p>\n<p style=\"text-align: center;\">Neem 36 and 37 at Al-Houta Oil Factory<\/p>\n<\/td>\n<td style=\"width: 11.191%; text-align: left;\">Naeem, Hawtah and Ghaneh<\/td>\n<td style=\"width: 14.0656%; height: 24px; text-align: left;\">2006-07-05<\/td>\n<td style=\"width: 34.4969%; text-align: center;\">\n<p style=\"text-align: left;\">&#8211;&nbsp;Construction and extension of pipelines for 3 oil-producing wells in Al-Houta, and linking them to the oil-gas separation plant in Al-Houta.<\/p>\n<p style=\"text-align: left;\">&#8211; Construction and laying of pipelines for two water injection wells with different diameters of 4, 6, and 8 inches.<\/p>\n<p style=\"text-align: left;\">&#8211; Providing all the necessary labor, equipment and materials to complete the work according to Aramco&#8217;s requirements and to ensure that wells are put into use for water injection as well as crude oil production.<\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 9.34283%; height: 24px; text-align: center;\">197<\/td>\n<td style=\"width: 15.8111%; height: 24px; text-align: center;\">\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Arabian Oil Company<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-size: 14pt;\">Saudi Arabia<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #00457c; font-size: 14pt;\">&#8220;Saudi Aramco&#8221;<\/span><\/p>\n<\/td>\n<td style=\"width: 14.8871%; text-align: center;\">\n<p style=\"text-align: center;\">Connecting Hawiyah Wells No. 528, 532, 534 to Hawiyah Oil Factory No. 4<\/p>\n<p style=\"text-align: center;\">With 97 fencing around Haradh Oil Factory No. 2<\/p>\n<\/td>\n<td style=\"width: 11.191%; text-align: center;\">Hawiyah and Haradh<\/td>\n<td style=\"width: 14.0656%; height: 24px; text-align: center;\">2006-12-23<\/td>\n<td style=\"width: 34.4969%; text-align: center;\">\n<p style=\"text-align: left;\">&#8211; Construction and laying of pipelines for 3 wells for the production of crude oil Nos. 528, 532, 534 and linking them to the oil-gas separation plant No. 4 in Al-Hawiya area with diameters of 8 inches and a length of about 5 km.<\/p>\n<p style=\"text-align: left;\">&#8211; Making a secure net around 97 oil wells around the oil-gas separation plant No. 2 in Haradh.<\/p>\n<p style=\"text-align: left;\">&#8211; Providing all the necessary labor, equipment and materials to finish the work according to the requirements of Saudi Aramco.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Petroleum pipelines department<\/p>\n","protected":false},"author":1,"featured_media":392,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-390","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/pages\/390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/comments?post=390"}],"version-history":[{"count":35,"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/pages\/390\/revisions"}],"predecessor-version":[{"id":1141,"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/pages\/390\/revisions\/1141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/media\/392"}],"wp:attachment":[{"href":"https:\/\/albader.com.sa\/en\/wp-json\/wp\/v2\/media?parent=390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}